![](https://barnack.com/wp-content/uploads/2021/03/eagle-business-park-phase-2-aerial.jpg)
Design & Builds
With our extensive experience of building third party Design and Build Industrial premises and estates we can add value for money in terms of design, specification and delivery of programmes. As the main contractor we specialise in being involved with the planning permission and at the start of the design process so that we can co ordinate consultants, produce contracts and meet contractual and institutional standards as required.
- Value engineering
- Land infrastructure development
- Warranties
- BREEAM
- Quantity surveying
- “Turn Key” contracts
- Industrial Units
- Commercial Estates
![summit-park-hampton-peterborough-new-development-starbucks](https://barnack.com/wp-content/uploads/elementor/thumbs/summit-park-hampton-peterborough-new-development-starbucks-p5d06vcxvoion06mtkcuvhcs22yl7gbfakq3hf395c.jpg)
![summit-park-hampton-peterborough-new-offices-development](https://barnack.com/wp-content/uploads/elementor/thumbs/summit-park-hampton-peterborough-new-offices-development-p5d07024tup491zt24dzpy6310bf9xu2z7zivswaa8.jpg)
![photocentric-finished-building-peterborough](https://barnack.com/wp-content/uploads/elementor/thumbs/photocentric-finished-building-peterborough-pjjiyxtmj0f0yuvnvw9eefalgczuden9h2alvep2q8.jpg)
![chestnut-court-lakes-business-park-st-ives-2](https://barnack.com/wp-content/uploads/elementor/thumbs/chestnut-court-lakes-business-park-st-ives-2-p5d0uf7d48rbj9z3aquccjejvmvo2ftb7562d0658w.jpg)
What our clients say
Following a competitive tender process, Barnack Estates UK Ltd were selected as the maain contractor for the construction of our new 60,000 sq-ft warehouse and offices at Papworth Everard, Cambridge.
We were very impressed with their handling of the whole project, from initial discussions and tendering, through to actual construction and final completion. Rob, Gary and their team delivered a quality building, on time and within budget, and I would have no hesitation in recommending their service.
The construction of Titan House in Peterborough has been completed to the highest standard possible, on budget and ahead of time. Overall, it has been a joy to work with Rob and his team being both effortless and pleasurable.
In mid January of 2021 Photocentric asked Barnack Estates to develop a piece of unused wasteland in Peterborough. Before the end of November 2021 Barnack Estates had handed the keys over and we had a building that we could start to kit out with processes to change the way the world manufactures. The building is state of the art in its energy capture and the working environment. Also the processes we have invented here and will operate in it will be showcased to the world from it.